Filter Search


Asia


Location Summary Deadline
India Supply Of Procurement Of "cab Heater/ Ventilation Assly". #*. Cab Heater/ Ventilation Assly Spec:clw/es/3/0109 Alt.- G. [ Warranty Period: 30 Months After The Date Of Delivery ] 2025-12-31
India Supply Of Side Wall Assembly For Wag-9hc Loco #*. Side Wall Assembly For Wag-9hc Loco As Per Drg.no. 29171040 Alt B Spec. Clw/ms/3/0154 Alt.2 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-31
India Supply Of Side Wall Assembly For Wag-9hc Loco #*. Side Wall Assembly For Wag-9hc Loco As Per Drg.no. 29171040 Alt B Spec. Clw/ms/3/0154 Alt.2 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-31
Bangladesh Contract Award For: Annual Maintenance, Repair & Adjustment Works Of Mojuchowdhuryhat Ferry Ghat (1st January 2025 To 31st December 2025). contract Value (taka): 1461402.100 no. Of Tenders/proposals Sold: 143 no. Of Tenders/proposals Received: 139 ten 2025-12-31
Bangladesh Contract Award For: Annual Maintenance, Repair & Adjustment Works Of Alubazar Ro-ro &conventional Ferry Ghat Including Connecting Road (1st-january-2025 To 31st December-2025). contract Value (taka): 3010331.500 no. Of Tenders/proposals Sold: 168 no. O 2025-12-31
India Hiring Of Tipper Truck 2025-12-31
India Renovation Work Of Gentry And Sign Board Located In The Jurisdiction Of Municipal Corporation Greater . Annual Rate Contract-2024 2025-12-31
India Construction Of 23 Nos. Brick Type Ventillation Stoppings(1 Nos. Stopping At Main Dip(44l/md-cd-1) And 22 Nos. Stoppings To Course Air For The 2nd Phase Of Air Coursinh In Wp-ve-2) At Nandira Colliery, Talcher Area. 2025-12-31
India 463/2025 Construction Of Buds School 2025-12-31
India Annual Plan-mulanthuruthy Bp 2024-25- Completion Of Drain Construction In Padikkathara Road In Ward 6 Of Udayamperoor Gp. 2025-12-31
Whats app