Filter Search


Asia


Location Summary Deadline
India Supply Of Piston Holder #*. Piston Holder For Power Pack Drop As Per Drg.no. Mt01gm0098 Alt B [ Warranty Period: 30 Months After The Date Of Delivery ] ]bracket Lifter For Assly Cam Shaft Housing As Per Drg.no. Mt01gm0045 Alt B [warranty Period: 30 Months 2025-11-03
India Const. Of B/wall, Repair And Paving Of Ipb In Govt. School 2025-11-03
India Construction Of Major Bridge With Approaches On Talni Sapti Kohli Shirad Peva Unchegaon Bhanegaon Sh-361 Kothala Hadgaon Road Sh-416 Km 6/700 Tq. Hadgaon Dist. 2025-11-03
Bangladesh Contract Award For: Repair Of Roads Cut By Different Government/ Non-government Organizations/ Public Under Different Wards Of Zone-5 Of Dncc (group- Xi). Fy2023-24. contract Value (taka): 9498939.800 no. Of Tenders/proposals Sold: 287 no. Of Tenders/p 2025-11-03
Bangladesh Contract Award For: Part-a: Improvement Of Chungi Beel Eidgah Field To Village West Side Road By Bc (ch. 00-1025m) (road Id No: 368525199) Under Monohardi Upazila, District: Narsingdi. [salvage Cost: Tk. 255025.42] Part-b: Slope Protection Work Of Chungi 2025-11-03
India Mt Shed 2025-11-03
India Lmg Bkr/pd 2025-11-03
India Construction Of Underground 600mm.dia. R.c.c. Pipe Drain At Village Uradi(from House Of Hari Bodalkar To Vasanta Dongarwar House) Grampanchayat Uradi Tah Kurkheda Dist 2025-11-03
India Supply Of 25102059: Brake Equalizer(top As Per Clw Drg.no. 06/4/19/110. For Wag-7 2025-11-03
India Supply Of Sleeve Upper Stubsh #*. Sleeve Upper Stubsh As Per Drg.no. 8261195 Alt Ba Specn: As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted 2025-11-03
Whats app